  • Power system studies: cheat sheet

Power system studies: cheat sheet

  • Created
    Tuesday, 16 June 2015
  • Voting
    Average rating
    • 1
    • 2
    • 3
    • 4
    • 5
  • Favourites
    Add to favourites
    Click to subscribe
  • Hits
    419 views
  • Tags
    Power system studies

http://migratorysoaringbirds.undp.birdlife.org/sites/default/files/mike-fisher-power-lines-4925197048_7ebc0d6a7f_o.jpg

Power system studies performed on industrial networks include 

1.  Load flow : (Popular tools-ETAP, SKM)

Load flow study is generally used to determine steady state system voltage levels and power flows under different system operating conditions. All power equipment should be Rated for the maximum power that can flow through it under any system operating condition. The system voltage levels should be close to 1p.u. under most operating conditions.

Challenges: a) system load fluctuations  b) equipment outages(planned or unplanned) scenarios generally present problems in meeting the above objectives.

Standards: IEEE Std 141, Chapter 3 for steady state system voltage tolerances

Things to keep in mind: 

Lower the system loading higher the system voltages (Not true for systems with active voltage control device, like Transformers with On-load tap changers, Generators with AVRs, etc)

When system studies are performed with non-test values of equipment impedance, impedance tolerances ( Z+Tolerance) should be used to calculated lowest possible system voltage. (IEEE C57, 9.2)

Cable impedance varies with cable temperature. Cable impedance at maximum cable operating temperature (Often 90oC) is used in Load flow studies to calculate maximum voltage drops. This becomes significant when the cable lengths are very long.

Results:

Transformer off-load transformer tap setting (Transformer off-load tap changer settings generally help keep system voltage with in the range specified in the IEEE standard. If not, the overall system design should be reviewed, on-load tap changers, VAR compensator can be considered to solve system voltage problems.

Check of equipment power ratings. (The system design generally does not require a software tool, the software is used only to check the design. MVA method is a very useful tool for engineers designing industrial power systems without the help of a software tool.)

 

 2.  Short circuit : (Popular tools-ETAP, SKM)

The objective of the short circuit study is generally to establish the short circuit ratings of electrical equipment (switchgear, MCC’s etc) per a standard. Generally ANSI(C 37) in America and IEC 60909 in Europe. The equipment short circuit rating should be more the short circuit current current available at the equipment terminals to prevent damage to equipment (Note - Equipment is protected only if the short-circuit condition is limited to a specified short time).

Important Definitions :

Rated short-time withstand current (Ik) - The rms value of the current that the switchgear can carry in the closed position during a specified short time under prescribed conditions of use and behavior. 

Rated duration of short-circuit (tk) - The interval of time for which switchgear can carry, in the closed position, a current equal to its rated short-time withstand current. 

Rated peak withstand current (Ip) - The peak current associated with the first major loop of the rated short-time withstand current that switchgear can carry in the closed position under prescribed conditions of use and behavior. (This rating indicates capacity of the equipment to withstand mechanical stress, which is maximum at peak short circuit current.

 

 3.  Motor starting : (Popular tools-ETAP, SKM)

The objective of the motor starting calculation is to determine if the electrical system can support starting of large motors in the system while maintaining the voltage at the motor terminals and other buses within acceptable limits.

 4.  Transient stability : (Popular tools-ETAP, SKM)

 5.  Protective relay coordination and Arc flash : (Popular tools-ETAP, SKM)

The objective of the relay coordination calculation is to determine the ratings, settings and characteristics of the overcurrent protective devices in the system to assure a secure and reliable system protection. This system study includes load flow, short circuit and motor starting calculations only. The objective of the arc flash calculation is to estimate the incident energy in the event of an arc flash and determine the personal protective clothing requirements at typical working distances. This system study includes load flow, short circuit and motor starting calculations only.

 6.  Switching transients : (Popular tools-ATP, PSCAD)

 

This article is incomplete. More content will be added soon.

  • 2 Comment
    Send

Comments  

0 # Trisha 2015-07-19 11:35
Way cool! Some very valid points! I appreciate you penning this article and the rest of the site is
very good.
0 # Kory 2015-07-16 09:41
Very good site you have here but I was wanting to know if you
knew of any message boards that cover the same topics
discussed here? I'd really love to be a part of community where I can get
advice from other experienced individuals that share the same interest.
If you have any recommendations, please let me know. Kudos!
Refresh comments list

You have no rights to post comments. Login to post comments

JComments

Top rated

... loading images
11 Days in Mexico and Cuba
11 Days in Mexico and Cuba
By far my best vacation!! 3 days in Mexico city, 3 days in Havana a...
Indian Land Acquisition ordinance/Bill 2015
Indian Land Acquisition ordinance/Bill 2015
Indian Land Acquisition Bill Indian Land Acquisition Bill of 2013 i...
My Italy Travelouge
My Italy Travelouge
Why not pen down my experience of Italy… Not really meant to be a t...
Russia: sanctions and counter sanctions
Russia: sanctions and counter sanctions
The US and EU imposed economic sanctions on Russia as a punishment ...
The fertilizer scandal and agriculture
The fertilizer scandal and agriculture
To understand the Fertilizer scandal, one needs to recognize the in...
Left leaning Latin America
Left leaning Latin America
Latin America is the hot bed for neo-socialism. Socialism has thriv...
Monsanto: a curse or a blessing?
Monsanto: a curse or a blessing?
Monsanto is a publicly traded American multinational agrochemical a...